Local

General Company for Water in Hasakah Completes Drinking Water Network in Tal Brak Countryside

24 November 20265 min read

General Company for Water in Hasakah Completes Drinking Water Network in Tal Brak Countryside
A drinking water network exceeding 2,600 meters enters service in Tal Brak countryside, aiming to supply about 6,000 people.

Network Implementation in Tal Brak Countryside

The General Company for Drinking Water and Sanitation in Hasakah Governorate, in cooperation with the humanitarian organization CARE, has completed a drinking water network in the villages surrounding the Tal Adhan water station in the northern countryside of the town of Tal Brak. The network aims to supply water to about 6,000 people and reduce residents' reliance on private water tankers.

Details of the Work

Company Director General Farhan al-Owais told SANA on Tuesday that the technical crews began implementing the project at the end of last September, with the aim of delivering clean drinking water to residents' homes in the villages surrounding the station through a secondary distribution network.

Al-Owais explained that the works included laying a main line 2,400 meters long with a diameter of 110 mm, and a branch line 250 meters long with a diameter of 90 mm, in addition to installing 12 distribution junctions. He noted that the network has entered service and water is now reaching residents in the area.

Tal Adhan Station and Other Wells

The Tal Adhan water station is part of the Tal Brak water project. It includes eight wells and three horizontal pumps, and supplies drinking water to the town of Tal Brak and the surrounding population centers. It also includes a filling point for tankers, which transports water to population centers far from the network.

During November of this year, the company returned three wells to service: two wells in the Tal Hamis area in the countryside of Qamishli, and one well in the village of al-Rashidiyah in the countryside of the town of Derbasiyah. This followed completion of the necessary technical maintenance and their commissioning, contributing to improved water availability for residents.

In the same context, on October 25 last, the company completed maintenance of three drinking water wells in the governorate's countryside: two wells in the subdistrict of al-Jawadiyah, and one well in the village of Dhabbana.

The Company's Plans

Al-Owais affirmed the company's commitment to continue implementing drinking water projects in rural areas and maintaining existing networks, particularly expanding the construction of desalination stations in areas lacking sources of potable water, and continuing the maintenance of rural drinking water wells throughout the governorate.

Source: Syrian Arab News Agency (SANA)

Comments (0)

0 / 600
No comments yet. Be the first to comment.